Projects

IRAQ SEWERAGE PROJECT

IRAQ SEWERAGE PROJECT

Contractor : EYDO CO

Project Location : Iraq

 

Diameter : 600-900 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 804 m

Manufacturing Date : 2012

AKDERE SHHP PROJECT

AKDERE SHHP PROJECT

Contractor : Ergünler Yol Yapı İnşaat

Project Location : Turkey

 

Diameter : 1700 mm

Pressure : 6-16 Bar

Stiffness​ : 5000 Pa

Length : 3800 m

Manufacturing Date : 2012-2014

SİVAS HAFİK IRRIGATION PROJECT

SİVAS HAFİK IRRIGATION PROJECT

Clients :  DSİ 19. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : ENK Yapı – Yağız İnşaat

Diameter : 450-2100 mm

Pressure : 6-16 Bar

Stiffness​ : 2500 Pa

Length : 74088 m

Manufacturing Date : 2011

UZBEKISTAN COLLECTOR PROJECT

UZBEKISTAN COLLECTOR PROJECT

Contractor : CENK ENDÜSTRİ

Project Location : Özbekistan

 

Diameter : 700 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 629 m

Manufacturing Date : 2012

PUMP STATION PROJECT

PUMP STATION PROJECT

Contractor : ANADOLU FLYGT

Project Location : Turkey

 

Diameter : 1000-1800 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 2000 m

Manufacturing Date : 20123-2015

KIRIKKKALE KESKİNCERİT MÜMİNLİ IRRIGATION PROJECT

KIRIKKKALE KESKİNCERİT MÜMİNLİ IRRIGATION PROJECT

Clients :  DSİ 5. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : ENK Yapı

Diameter : 450-800 mm

Pressure : 4-10 Bar

Stiffness​ : 2500 Pa

Length : 9846 m

Manufacturing Date : 2012-2013

ROMANIA HATEG SHHP PROJECT

ROMANIA HATEG SHHP PROJECT

Contractor : RENEWABLES INVEST

Project Location : Romania

 

Diameter : 600 mm

Pressure : 6-32 Bar

Stiffness​ : 10000 Pa

Length : 5100 m

Manufacturing Date : 2012

KONYA ALAKOVA SEWERAGE PROJECT

KONYA ALAKOVA SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : METSE YAPI

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 750 m

Manufacturing Date : 2013

KONYA KARATAY SEWERAGE PROJECT

KONYA KARATAY SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : HAYATİ DÜNDAR LTD. ŞTİ

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 500 m

Manufacturing Date : 2013

ROMANIA BUDAC SHHP PROJECT

ROMANIA BUDAC SHHP PROJECT

Contractor : SC MINERAL OIL S.R.L

Project Location : Romania

 

Diameter : 800-1200 mm

Pressure : 6-16 Bar

Stiffness​ : 5000 Pa

Length : 3170 m

Manufacturing Date : 2014

KÜTAHYA HASANLAR IRRIGATION PROJECT

KÜTAHYA HASANLAR IRRIGATION PROJECT

Clients : DSİ 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Demars İnşaat

Diameter : 800 mm

Pressure : 4-10 Bar

Stiffness​ : 2500 Pa

Length : 5200 m

Manufacturing Date : 2012

FLAME ADVENTURE PIPE PROJECT FOR 3. AIRPORT

FLAME ADVENTURE PIPE PROJECT FOR 3. AIRPORT

Contractor : CENK ENDÜSTRİ

Project Location : Türkiye

Diameter : 450 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 135 m

Manufacturing Date : 2017

BALIKESİR HAVRAN IRRIGATION PROJECT

BALIKESİR HAVRAN IRRIGATION PROJECT

Clients : DSİ 25. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Hisar Yapı

Diameter : 500-1300 mm

Pressure : 6-10 Bar

Stiffness​ : 2500 Pa

Length : 2051 m

Manufacturing Date : 2012

BULGARIA SHHP PROJECT

BULGARIA SHHP PROJECT

Contractor : INFRABULPLAST

Project Location : Bulgaria

 

Diameter : 1400 mm

Pressure : 6 Bar

Stiffness​ : 5000 Pa

Length : 774 m

Manufacturing Date : 2014

ROMANIA DRAGASANI SEWERAGE PROJECT

ROMANIA DRAGASANI SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 500-800 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4320 m

Manufacturing Date : 2014

CZECH REPUBLIC PROJECT

CZECH REPUBLIC PROJECT

Contractor : TORALEX S.R.O

Project Location : Czech Republic 

 

Diameter : 1100 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 130 m

Manufacturing Date : 2014

BULGARIA ENERGIE CHIPROCI SHHP PROJECT

BULGARIA ENERGIE CHIPROCI SHHP PROJECT

Contractor : HIDROTRACE

Project Location : Bulgaria

 

Diameter : 1200-1300 mm

Pressure : 6 Bar

Stiffness​ : 5000 Pa

Length : 2088 m

Manufacturing Date : 2014

IRAQ IRRIGATION PROJECT

IRAQ IRRIGATION PROJECT

Contractor : EYDO CO

Project Location : Iraq

 

Diameter : 700 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 500 m

Manufacturing Date : 2012

AYDIN BOZDOĞAN IRRIGATION PROJECT

AYDIN  BOZDOĞAN IRRIGATION PROJECT

Clients : DSİ . REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Akeli İnşaat

Diameter : 450-700 mm

Pressure : 4-6 Bar

Stiffness​ : 2500 Pa

Length : 2748 m

Manufacturing Date : 2012

ROMANIA FIENI SHHP PROJECT

ROMANIA FIENI SHHP PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 400-500 mm

Pressure : 16-25 Bar

Stiffness​ : 10000 Pa

Length : 8543 m

Manufacturing Date : 2014

ROMANIA SATU MARE SEWERAGE PROJECT

ROMANIA SATU MARE SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 500 mm

Pressure : 10 Bar

Stiffness​ : 10000 Pa

Length : 1000 m

Manufacturing Date : 2015

SERBIA NOVI SAD SEWERAGE PROJECT

SERBIA NOVI SAD SEWERAGE PROJECT

Contractor : GP GRADITELJ NS

Project Location : Serbia

 

Diameter : 500-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2070 m

Manufacturing Date : 2014-2015

AVUSTRIA SHHP PROJECT

AVUSTRIA SHHP PROJECT

Contractor : HAIDER

Project Location : Austria

 

Diameter : 600-800 mm

Pressure : 16-25 Bar

Stiffness​ : 5000 Pa

Length : 3370 m

Manufacturing Date : 2014

MUSTAFA KEMAL PASHA GÜLLÜCE IRRIGATION PROJECT

MUSTAFA KEMAL PASHA GÜLLÜCE IRRIGATION PROJECT

Clients :  DSİ 1. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Akyazı İnşaat

Diameter : 600-2100 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 3516 m

Manufacturing Date : 2012

SAKARYA FERİZLİ NALKÖY IRRIGATION PROJECT

SAKARYA FERİZLİ NALKÖY IRRIGATION PROJECT

Clients : DSİ 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Ogm Yapı - Hazmer İnşaat 

Diameter : 800-1000 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 5000 m

Manufacturing Date : 2013

BURSA TÜFEKÇİOĞLU MANSION SHHP PROJECT

BURSA TÜFEKÇİOĞLU MANSION SHHP PROJECT

Contractor: AFE ELEKTRİK

Project Location : Turkey

 

Diameter : 500-1200 mm

Pressure : 1-66 Bar

Stiffness​ : 5000 Pa

Length : 4695 m

Manufacturing Date : 2015

ROMANIA ORADEA AIRPORT SEWERAGE PROJECT

ROMANIA ORADEA AIRPORT  SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 600-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 5386 m

Manufacturing Date : 2015

ROMANIA BREAZA SEWERAGE PROJECT

ROMANIA BREAZA  SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3556 m

Manufacturing Date : 2015

ROMANIA NİRAJ SHHP PROJECT

ROMANIA NİRAJ SHHP  PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 700-800 mm

Pressure : 16-32 Bar

Stiffness​ : 5000 Pa

Length : 6154 m

Manufacturing Date : 2015

SERBIA VRANJSKA PROJECT

SERBIA VRANJSKA  PROJECT

Contractor : GREEN ENERGY

Project Location : Serbian

 

Diameter : 800-900 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 2344 m

Manufacturing Date : 2015

SİVAS YILDIZELİ TOPULYURDU IRRIGATION PROJECT

SİVAS YILDIZELİ TOPULYURDU IRRIGATION PROJECT

Clients : DSİ 19. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Coşaroğulları İnşaat

Diameter : 600 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 1400 m

Manufacturing Date : 2013

KÜTAHYA BEŞKARIŞ IRRIGATION PROJECT

KÜTAHYA BEŞKARIŞ IRRIGATION PROJECT

Clients :  DSI 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Sistem Elektromekanik 

Diameter : 800-1900 mm

Pressure : 10 Bar

Stiffness​ : 2500 Pa

Length : 8157 m

Manufacturing Date : 2013

SERBIA MHE KOPAONIK SHPP PROJECT

SERBIA MHE KOPAONIK SHPP PROJECT

Contractor : VATRA D.O.O. 

Project Location : Serbia

 

Diameter : 700-800 mm

Pressure : 6-10 Bar

Stiffness​ : 5000 Pa

Length : 648 m

Manufacturing Date : 2016

ROMANIA CARENSEBES SEWERAGE PROJECT

ROMANIA CARENSEBES  SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 500-1400 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 673 m

Manufacturing Date : 2015

ROMANIA CALARASİ SEWERAGE PROJECT

ROMANIA CALARASİ SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 234 m

Manufacturing Date : 2015

SLOVENIA SHPP PROJECT

SLOVENIA SHPP PROJECT

Contractor : PIPE LIFE SLOVENIA

Project Location : Slovenia

 

Diameter : 600 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 336 m

Manufacturing Date : 2016

ROMANYA DUMITRA SHPP PROJECT

ROMANYA DUMITRA SHPP PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 1800-2000 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 348 m

Manufacturing Date : 2017

ROMANIA MİRESSİ PROJECT

ROMANIA MİRESSİ PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 125-600 mm

Pressure : 1 Bar

Stiffness​ : 5000-10000 Pa

Length : 981 m

Manufacturing Date : 2015

KOÇYAZI KARACADAĞ SEWERAGE PROJECT

KOÇYAZI KARACADAĞ SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : Seril İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3739 m

Manufacturing Date : 2015

ROMANIA BRAD SEWERAGE PROJECT

ROMANIA BRAD SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600-800 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1850 m

Manufacturing Date : 2015

BALIKESİR AYVALIK CUNDA PENINSULA SEWERAGE PROJECT

BALIKESİR AYVALIK CUNDA PENINSULA SEWERAGE PROJECT

Clients : Balıkesir’s Water and Sewerage Adiministration - BASKİ

Project Location : Turkey

Contractor : İMT Mühendislik

Diameter : 600 mm

Pressure : 10 Bar

Stiffness​ : 10000 Pa

Length : 5069 m

Manufacturing Date : 2015

ROMANIA OLANESTI SEWERAGE PROJECT

ROMANIA OLANESTI SEWERAGE PROJECT

Clients : GRANDPIPE ROMANYA SRL

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 2000 m

Manufacturing Date : 2015

ROMANIA GALATI SEWERAGE PROJECT

ROMANIA GALATI SEWERAGE PROJECT

Clients : GRANDPIPE ROMANYA SRL

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL

Diameter : 200-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1675 m

Manufacturing Date : 2016

KONYA CENTER AND PROVINCIAL MISCELLANEOUS STSEWERAGE CONSTRUCTION WORK

KONYA CENTER AND PROVINCIAL MISCELLANEOUS STSEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4700 m

Manufacturing Date : 2016

KARATAY TOWN YARMA STREET SEWERAGE CONSTRUCTION WORK

KARATAY TOWN YARMA STREET SEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : SİDAR ÇATAK İŞ ORTAKLIĞI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 14355 m

Manufacturing Date : 2016

2015 YEAR 8 PART SECTION SEWERAGE CONSTRUCTION WORK

2015 YEAR 8 PART SECTION SEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : SİDAR ÇATAK İŞ ORTAKLIĞI 

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2200 m

Manufacturing Date : 2016

EUROPEAN SECOND REGION 2014 2 PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

EUROPEAN SECOND REGION 2014 2 PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

Clients : İstanbul’s Water and Sewerage Adiministration - İSKİ

Project Location : Turkey

Contractor : AKM YAPI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2857 m

Manufacturing Date : 2016

CL1-OT1 DROBETA TURNU SEVERIN SI GURA

CL1-OT1 DROBETA TURNU SEVERIN SI GURA

Clients : İstanbul’s Water and Sewerage Adiministration

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL 

Diameter : 1200 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 686 m

Manufacturing Date : 2016

KARABAG AND İNSUYU LOCATIONS SEWERAGE CONSTRUCTION WORK

KARABAG AND İNSUYU LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : TUNAHAN MÜH. İNŞ. SAN. VE TİC. LTD. ŞTİ

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 22630 m

Manufacturing Date : 2016

SERBIA AUTO PUT LJIG PRELJINA PROJECT

SERBIA AUTO PUT LJIG PRELJINA PROJECT

Contractor : VATRA D.O.O.

Project Location : Serbia

 

Diameter : 150-500 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 4264 m

Manufacturing Date : 2016

TURGUT VE SÜLÜKLÜ LOCATIONS SEWERAGE CONSTRUCTION WORK

TURGUT VE SÜLÜKLÜ LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : SERİL İNŞ. SAN. VE TİC. LTD. ŞTİ.

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 16500 m

Manufacturing Date : 2016

HAYIROĞLU, AYDOĞDU AND KESMEZ LOCATIONS CANALIZATION CONSTRUCTION WORK

HAYIROĞLU, AYDOĞDU AND KESMEZ LOCATIONS CANALIZATION CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : NAİL GÜLOĞLU, HASYOL İNŞ.TİC.CELAL TÜRKCAN VE ORTA. KOLL.ŞTİ

Diameter : 200 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 440 m

Manufacturing Date : 2016

ILGIN-YUNAK-HORTU SEWERAGE CONSTRUCTION WORK

ILGIN-YUNAK-HORTU SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration -KOSKİ

Project Location : Turkey

Contractor : TUNAHAN MÜH. İNŞ. SAN. VE TİC. LTD. ŞTİ 

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2630 m

Manufacturing Date : 2016

YALIHÜYÜK-SARAYÖNÜ-KADIOĞLU SEWERAGE CONSTRUCTION WORK

YALIHÜYÜK-SARAYÖNÜ-KADIOĞLU SEWERAGE CONSTRUCTION WORK

Clients :  KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : HEYKEL İNŞAAT 

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 7369 m

Manufacturing Date : 2016

BUSKİ PRECIPITATION PIPING WORK UNDER THE POOL

BUSKİ PRECIPITATION PIPING WORK UNDER THE POOL

Clients : Bursa’s Water and Sewerage Adiministration - BUSKİ

Project Location : Turkey

Contractor : PASSAVANT Energy & Environment GmbH

Diameter : 350-800 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 284 m

Manufacturing Date : 2016

EUROPEAN SECOND REGION 2014 2nd PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

EUROPEAN SECOND REGION 2014 2nd PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

Clients : İstanbul’s Water and Sewerage Adiministration - İSKİ

Project Location : Turkey

Contractor : ARMAK İNŞAAT TAH.SAN.TİC.A.Ş

Diameter : 800-1600 mm

Pressure : 4 Bar

Stiffness​ : 10000 Pa

Length : 860 m

Manufacturing Date : 2016

ORTAKÖY AND KARABULUT LOCATIONS SEWERAGE CONSTRUCTION WORK

ORTAKÖY AND KARABULUT LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients :  KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : TİKA MÜHENDİSLİK

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 15000 m

Manufacturing Date : 2016

KONYA KARATAY SEWERAGE PROJECT

KONYA KARATAY SEWERAGE PROJECT

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor :  SEMPA LTD.ŞTİ.

Diameter : 300-1400 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1000 m

Manufacturing Date : 2016

RUSSIAN NTT PROJECT

RUSSIAN NTT PROJECT

Contractor : NTT

Project Location : Russian

 

Diameter : 3900 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 60 m

Manufacturing Date : 2016

AKINCILAR, DEDELER VE OĞUZELİ SEWERAGE CONSTRUCTION WORK

AKINCILAR, DEDELER VE OĞUZELİ SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : LAPİDEM YAPI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1300 m

Manufacturing Date : 2017

MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4700 m

Manufacturing Date : 2017

2017 YEAR 3.PART MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

2017 YEAR 3.PART MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : Akçel İnşaat

Diameter : 600-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 9500 m

Manufacturing Date : 2017

2017 YEAR OF SEWER CONSTRUCTION AND IMPROVEMENT WORK KARATAY

2017 YEAR OF SEWER CONSTRUCTION AND IMPROVEMENT WORK KARATAY

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1012 m

Manufacturing Date : 2017

SERBIA DRANAGE PROJECT

SERBIA DRANAGE PROJECT

Contractor : VATRA D.O.O

Project Location : Serbia

 

Diameter : 150-400 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 3560 m

Manufacturing Date : 2017

SERBIA DRANAGE PROJECT

SERBIA DRANAGE PROJECT

Contractor : VATRA D.O.O

Project Location : Serbia

 

Diameter : 150-300 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 810 m

Manufacturing Date : 2017

SERBIA PROJECT

SERBIA PROJECT

Contractor : VATRA D.O.O. 

Project Location : Serbia

 

Diameter : 500-600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3709 m

Manufacturing Date : 2017

UKRAINA PROJECT

UKRAINA PROJECT

Contractor : LISABILITY COMPANY PIPEHOLDING

Project Location : Ukrania

 

Diameter : 1200-1500 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1320 m

Manufacturing Date : 2017

UZBEKISTAN COLLECTOR PROJECT

UZBEKISTAN COLLECTOR PROJECT

Contractor : CENK ENDÜSTRİ

Project Location : Özbekistan

 

Diameter : 700 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 629 m

Manufacturing Date : 2012

PUMP STATION PROJECT

PUMP STATION PROJECT

Contractor : ANADOLU FLYGT

Project Location : Turkey

 

Diameter : 1000-1800 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 2000 m

Manufacturing Date : 20123-2015

FLAME ADVENTURE PIPE PROJECT FOR 3. AIRPORT

FLAME ADVENTURE PIPE PROJECT FOR 3. AIRPORT

Contractor : CENK ENDÜSTRİ

Project Location : Türkiye

Diameter : 450 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 135 m

Manufacturing Date : 2017

AKDERE SHHP PROJECT

AKDERE SHHP PROJECT

Contractor : Ergünler Yol Yapı İnşaat

Project Location : Turkey

 

Diameter : 1700 mm

Pressure : 6-16 Bar

Stiffness​ : 5000 Pa

Length : 3800 m

Manufacturing Date : 2012-2014

ROMANIA HATEG SHHP PROJECT

ROMANIA HATEG SHHP PROJECT

Contractor : RENEWABLES INVEST

Project Location : Romania

 

Diameter : 600 mm

Pressure : 6-32 Bar

Stiffness​ : 10000 Pa

Length : 5100 m

Manufacturing Date : 2012

ROMANIA BUDAC SHHP PROJECT

ROMANIA BUDAC SHHP PROJECT

Contractor : SC MINERAL OIL S.R.L

Project Location : Romania

 

Diameter : 800-1200 mm

Pressure : 6-16 Bar

Stiffness​ : 5000 Pa

Length : 3170 m

Manufacturing Date : 2014

BULGARIA SHHP PROJECT

BULGARIA SHHP PROJECT

Contractor : INFRABULPLAST

Project Location : Bulgaria

 

Diameter : 1400 mm

Pressure : 6 Bar

Stiffness​ : 5000 Pa

Length : 774 m

Manufacturing Date : 2014

BULGARIA ENERGIE CHIPROCI SHHP PROJECT

BULGARIA ENERGIE CHIPROCI SHHP PROJECT

Contractor : HIDROTRACE

Project Location : Bulgaria

 

Diameter : 1200-1300 mm

Pressure : 6 Bar

Stiffness​ : 5000 Pa

Length : 2088 m

Manufacturing Date : 2014

ROMANIA FIENI SHHP PROJECT

ROMANIA FIENI SHHP PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 400-500 mm

Pressure : 16-25 Bar

Stiffness​ : 10000 Pa

Length : 8543 m

Manufacturing Date : 2014

AVUSTRIA SHHP PROJECT

AVUSTRIA SHHP PROJECT

Contractor : HAIDER

Project Location : Austria

 

Diameter : 600-800 mm

Pressure : 16-25 Bar

Stiffness​ : 5000 Pa

Length : 3370 m

Manufacturing Date : 2014

BURSA TÜFEKÇİOĞLU MANSION SHHP PROJECT

BURSA TÜFEKÇİOĞLU MANSION SHHP PROJECT

Contractor: AFE ELEKTRİK

Project Location : Turkey

 

Diameter : 500-1200 mm

Pressure : 1-66 Bar

Stiffness​ : 5000 Pa

Length : 4695 m

Manufacturing Date : 2015

ROMANIA NİRAJ SHHP PROJECT

ROMANIA NİRAJ SHHP  PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 700-800 mm

Pressure : 16-32 Bar

Stiffness​ : 5000 Pa

Length : 6154 m

Manufacturing Date : 2015

SERBIA VRANJSKA PROJECT

SERBIA VRANJSKA  PROJECT

Contractor : GREEN ENERGY

Project Location : Serbian

 

Diameter : 800-900 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 2344 m

Manufacturing Date : 2015

SERBIA MHE KOPAONIK SHPP PROJECT

SERBIA MHE KOPAONIK SHPP PROJECT

Contractor : VATRA D.O.O. 

Project Location : Serbia

 

Diameter : 700-800 mm

Pressure : 6-10 Bar

Stiffness​ : 5000 Pa

Length : 648 m

Manufacturing Date : 2016

SLOVENIA SHPP PROJECT

SLOVENIA SHPP PROJECT

Contractor : PIPE LIFE SLOVENIA

Project Location : Slovenia

 

Diameter : 600 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 336 m

Manufacturing Date : 2016

ROMANYA DUMITRA SHPP PROJECT

ROMANYA DUMITRA SHPP PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 1800-2000 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 348 m

Manufacturing Date : 2017

IRAQ SEWERAGE PROJECT

IRAQ SEWERAGE PROJECT

Contractor : EYDO CO

Project Location : Iraq

 

Diameter : 600-900 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 804 m

Manufacturing Date : 2012

KONYA ALAKOVA SEWERAGE PROJECT

KONYA ALAKOVA SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : METSE YAPI

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 750 m

Manufacturing Date : 2013

KONYA KARATAY SEWERAGE PROJECT

KONYA KARATAY SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : HAYATİ DÜNDAR LTD. ŞTİ

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 500 m

Manufacturing Date : 2013

ROMANIA DRAGASANI SEWERAGE PROJECT

ROMANIA DRAGASANI SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 500-800 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4320 m

Manufacturing Date : 2014

CZECH REPUBLIC PROJECT

CZECH REPUBLIC PROJECT

Contractor : TORALEX S.R.O

Project Location : Czech Republic 

 

Diameter : 1100 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 130 m

Manufacturing Date : 2014

ROMANIA SATU MARE SEWERAGE PROJECT

ROMANIA SATU MARE SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 500 mm

Pressure : 10 Bar

Stiffness​ : 10000 Pa

Length : 1000 m

Manufacturing Date : 2015

SERBIA NOVI SAD SEWERAGE PROJECT

SERBIA NOVI SAD SEWERAGE PROJECT

Contractor : GP GRADITELJ NS

Project Location : Serbia

 

Diameter : 500-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2070 m

Manufacturing Date : 2014-2015

ROMANIA ORADEA AIRPORT SEWERAGE PROJECT

ROMANIA ORADEA AIRPORT  SEWERAGE PROJECT

Contractor : AQUATAB SA

Project Location : Romania

 

Diameter : 600-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 5386 m

Manufacturing Date : 2015

ROMANIA BREAZA SEWERAGE PROJECT

ROMANIA BREAZA  SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3556 m

Manufacturing Date : 2015

ROMANIA CARENSEBES SEWERAGE PROJECT

ROMANIA CARENSEBES  SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 500-1400 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 673 m

Manufacturing Date : 2015

ROMANIA CALARASİ SEWERAGE PROJECT

ROMANIA CALARASİ SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 234 m

Manufacturing Date : 2015

ROMANIA MİRESSİ PROJECT

ROMANIA MİRESSİ PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 125-600 mm

Pressure : 1 Bar

Stiffness​ : 5000-10000 Pa

Length : 981 m

Manufacturing Date : 2015

KOÇYAZI KARACADAĞ SEWERAGE PROJECT

KOÇYAZI KARACADAĞ SEWERAGE PROJECT

Clients : KOSKİ

Project Location : Turkey

Contractor : Seril İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3739 m

Manufacturing Date : 2015

ROMANIA BRAD SEWERAGE PROJECT

ROMANIA BRAD SEWERAGE PROJECT

Contractor : GRANDPIPE ROMANYA SRL

Project Location : Romania

 

Diameter : 600-800 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1850 m

Manufacturing Date : 2015

BALIKESİR AYVALIK CUNDA PENINSULA SEWERAGE PROJECT

BALIKESİR AYVALIK CUNDA PENINSULA SEWERAGE PROJECT

Clients : Balıkesir’s Water and Sewerage Adiministration - BASKİ

Project Location : Turkey

Contractor : İMT Mühendislik

Diameter : 600 mm

Pressure : 10 Bar

Stiffness​ : 10000 Pa

Length : 5069 m

Manufacturing Date : 2015

ROMANIA OLANESTI SEWERAGE PROJECT

ROMANIA OLANESTI SEWERAGE PROJECT

Clients : GRANDPIPE ROMANYA SRL

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL

Diameter : 600 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 2000 m

Manufacturing Date : 2015

ROMANIA GALATI SEWERAGE PROJECT

ROMANIA GALATI SEWERAGE PROJECT

Clients : GRANDPIPE ROMANYA SRL

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL

Diameter : 200-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1675 m

Manufacturing Date : 2016

KONYA CENTER AND PROVINCIAL MISCELLANEOUS STSEWERAGE CONSTRUCTION WORK

KONYA CENTER AND PROVINCIAL MISCELLANEOUS STSEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4700 m

Manufacturing Date : 2016

KARATAY TOWN YARMA STREET SEWERAGE CONSTRUCTION WORK

KARATAY TOWN YARMA STREET SEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : SİDAR ÇATAK İŞ ORTAKLIĞI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 14355 m

Manufacturing Date : 2016

2015 YEAR 8 PART SECTION SEWERAGE CONSTRUCTION WORK

2015 YEAR 8 PART SECTION SEWERAGE CONSTRUCTION WORK

Clients : KOSKİ

Project Location : Turkey

Contractor : SİDAR ÇATAK İŞ ORTAKLIĞI 

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2200 m

Manufacturing Date : 2016

EUROPEAN SECOND REGION 2014 2 PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

EUROPEAN SECOND REGION 2014 2 PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

Clients : İstanbul’s Water and Sewerage Adiministration - İSKİ

Project Location : Turkey

Contractor : AKM YAPI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2857 m

Manufacturing Date : 2016

CL1-OT1 DROBETA TURNU SEVERIN SI GURA

CL1-OT1 DROBETA TURNU SEVERIN SI GURA

Clients : İstanbul’s Water and Sewerage Adiministration

Project Location : Romania

Contractor : GRANDPIPE ROMANYA SRL 

Diameter : 1200 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 686 m

Manufacturing Date : 2016

KARABAG AND İNSUYU LOCATIONS SEWERAGE CONSTRUCTION WORK

KARABAG AND İNSUYU LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : TUNAHAN MÜH. İNŞ. SAN. VE TİC. LTD. ŞTİ

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 22630 m

Manufacturing Date : 2016

SERBIA AUTO PUT LJIG PRELJINA PROJECT

SERBIA AUTO PUT LJIG PRELJINA PROJECT

Contractor : VATRA D.O.O.

Project Location : Serbia

 

Diameter : 150-500 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 4264 m

Manufacturing Date : 2016

TURGUT VE SÜLÜKLÜ LOCATIONS SEWERAGE CONSTRUCTION WORK

TURGUT VE SÜLÜKLÜ LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : SERİL İNŞ. SAN. VE TİC. LTD. ŞTİ.

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 16500 m

Manufacturing Date : 2016

HAYIROĞLU, AYDOĞDU AND KESMEZ LOCATIONS CANALIZATION CONSTRUCTION WORK

HAYIROĞLU, AYDOĞDU AND KESMEZ LOCATIONS CANALIZATION CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : NAİL GÜLOĞLU, HASYOL İNŞ.TİC.CELAL TÜRKCAN VE ORTA. KOLL.ŞTİ

Diameter : 200 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 440 m

Manufacturing Date : 2016

ILGIN-YUNAK-HORTU SEWERAGE CONSTRUCTION WORK

ILGIN-YUNAK-HORTU SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration -KOSKİ

Project Location : Turkey

Contractor : TUNAHAN MÜH. İNŞ. SAN. VE TİC. LTD. ŞTİ 

Diameter : 400-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 2630 m

Manufacturing Date : 2016

YALIHÜYÜK-SARAYÖNÜ-KADIOĞLU SEWERAGE CONSTRUCTION WORK

YALIHÜYÜK-SARAYÖNÜ-KADIOĞLU SEWERAGE CONSTRUCTION WORK

Clients :  KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : HEYKEL İNŞAAT 

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 7369 m

Manufacturing Date : 2016

BUSKİ PRECIPITATION PIPING WORK UNDER THE POOL

BUSKİ PRECIPITATION PIPING WORK UNDER THE POOL

Clients : Bursa’s Water and Sewerage Adiministration - BUSKİ

Project Location : Turkey

Contractor : PASSAVANT Energy & Environment GmbH

Diameter : 350-800 mm

Pressure : 10 Bar

Stiffness​ : 5000 Pa

Length : 284 m

Manufacturing Date : 2016

EUROPEAN SECOND REGION 2014 2nd PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

EUROPEAN SECOND REGION 2014 2nd PART WASTE LIQUID RAIN CONSTRUCTION PROJECT

Clients : İstanbul’s Water and Sewerage Adiministration - İSKİ

Project Location : Turkey

Contractor : ARMAK İNŞAAT TAH.SAN.TİC.A.Ş

Diameter : 800-1600 mm

Pressure : 4 Bar

Stiffness​ : 10000 Pa

Length : 860 m

Manufacturing Date : 2016

ORTAKÖY AND KARABULUT LOCATIONS SEWERAGE CONSTRUCTION WORK

ORTAKÖY AND KARABULUT LOCATIONS SEWERAGE CONSTRUCTION WORK

Clients :  KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : TİKA MÜHENDİSLİK

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 15000 m

Manufacturing Date : 2016

KONYA KARATAY SEWERAGE PROJECT

KONYA KARATAY SEWERAGE PROJECT

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor :  SEMPA LTD.ŞTİ.

Diameter : 300-1400 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1000 m

Manufacturing Date : 2016

RUSSIAN NTT PROJECT

RUSSIAN NTT PROJECT

Contractor : NTT

Project Location : Russian

 

Diameter : 3900 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 60 m

Manufacturing Date : 2016

AKINCILAR, DEDELER VE OĞUZELİ SEWERAGE CONSTRUCTION WORK

AKINCILAR, DEDELER VE OĞUZELİ SEWERAGE CONSTRUCTION WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : LAPİDEM YAPI

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1300 m

Manufacturing Date : 2017

MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 4700 m

Manufacturing Date : 2017

2017 YEAR 3.PART MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

2017 YEAR 3.PART MISCELLANEOUS STREETS SEWERAGE CONSTRUCTION AND BREAST WORK

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : Akçel İnşaat

Diameter : 600-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 9500 m

Manufacturing Date : 2017

2017 YEAR OF SEWER CONSTRUCTION AND IMPROVEMENT WORK KARATAY

2017 YEAR OF SEWER CONSTRUCTION AND IMPROVEMENT WORK KARATAY

Clients : KONYA’s Water and Sewerage Adiministration - KOSKİ

Project Location : Turkey

Contractor : FME İnşaat

Diameter : 300-1000 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1012 m

Manufacturing Date : 2017

SERBIA DRANAGE PROJECT

SERBIA DRANAGE PROJECT

Contractor : VATRA D.O.O

Project Location : Serbia

 

Diameter : 150-400 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 3560 m

Manufacturing Date : 2017

SERBIA DRANAGE PROJECT

SERBIA DRANAGE PROJECT

Contractor : VATRA D.O.O

Project Location : Serbia

 

Diameter : 150-300 mm

Pressure : 1 Bar

Stiffness​ : 5000 Pa

Length : 810 m

Manufacturing Date : 2017

SERBIA PROJECT

SERBIA PROJECT

Contractor : VATRA D.O.O. 

Project Location : Serbia

 

Diameter : 500-600 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 3709 m

Manufacturing Date : 2017

UKRAINA PROJECT

UKRAINA PROJECT

Contractor : LISABILITY COMPANY PIPEHOLDING

Project Location : Ukrania

 

Diameter : 1200-1500 mm

Pressure : 1 Bar

Stiffness​ : 10000 Pa

Length : 1320 m

Manufacturing Date : 2017

SİVAS HAFİK IRRIGATION PROJECT

SİVAS HAFİK IRRIGATION PROJECT

Clients :  DSİ 19. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : ENK Yapı – Yağız İnşaat

Diameter : 450-2100 mm

Pressure : 6-16 Bar

Stiffness​ : 2500 Pa

Length : 74088 m

Manufacturing Date : 2011

KIRIKKKALE KESKİNCERİT MÜMİNLİ IRRIGATION PROJECT

KIRIKKKALE KESKİNCERİT MÜMİNLİ IRRIGATION PROJECT

Clients :  DSİ 5. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : ENK Yapı

Diameter : 450-800 mm

Pressure : 4-10 Bar

Stiffness​ : 2500 Pa

Length : 9846 m

Manufacturing Date : 2012-2013

KÜTAHYA HASANLAR IRRIGATION PROJECT

KÜTAHYA HASANLAR IRRIGATION PROJECT

Clients : DSİ 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Demars İnşaat

Diameter : 800 mm

Pressure : 4-10 Bar

Stiffness​ : 2500 Pa

Length : 5200 m

Manufacturing Date : 2012

BALIKESİR HAVRAN IRRIGATION PROJECT

BALIKESİR HAVRAN IRRIGATION PROJECT

Clients : DSİ 25. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Hisar Yapı

Diameter : 500-1300 mm

Pressure : 6-10 Bar

Stiffness​ : 2500 Pa

Length : 2051 m

Manufacturing Date : 2012

IRAQ IRRIGATION PROJECT

IRAQ IRRIGATION PROJECT

Contractor : EYDO CO

Project Location : Iraq

 

Diameter : 700 mm

Pressure : 6 Bar

Stiffness​ : 10000 Pa

Length : 500 m

Manufacturing Date : 2012

AYDIN BOZDOĞAN IRRIGATION PROJECT

AYDIN  BOZDOĞAN IRRIGATION PROJECT

Clients : DSİ . REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Akeli İnşaat

Diameter : 450-700 mm

Pressure : 4-6 Bar

Stiffness​ : 2500 Pa

Length : 2748 m

Manufacturing Date : 2012

MUSTAFA KEMAL PASHA GÜLLÜCE IRRIGATION PROJECT

MUSTAFA KEMAL PASHA GÜLLÜCE IRRIGATION PROJECT

Clients :  DSİ 1. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Akyazı İnşaat

Diameter : 600-2100 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 3516 m

Manufacturing Date : 2012

SAKARYA FERİZLİ NALKÖY IRRIGATION PROJECT

SAKARYA FERİZLİ NALKÖY IRRIGATION PROJECT

Clients : DSİ 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Ogm Yapı - Hazmer İnşaat 

Diameter : 800-1000 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 5000 m

Manufacturing Date : 2013

SİVAS YILDIZELİ TOPULYURDU IRRIGATION PROJECT

SİVAS YILDIZELİ TOPULYURDU IRRIGATION PROJECT

Clients : DSİ 19. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Coşaroğulları İnşaat

Diameter : 600 mm

Pressure : 6 Bar

Stiffness​ : 2500 Pa

Length : 1400 m

Manufacturing Date : 2013

KÜTAHYA BEŞKARIŞ IRRIGATION PROJECT

KÜTAHYA BEŞKARIŞ IRRIGATION PROJECT

Clients :  DSI 3. REGIONAL DIRECTORATE

Project Location : Turkey

Contractor : Sistem Elektromekanik 

Diameter : 800-1900 mm

Pressure : 10 Bar

Stiffness​ : 2500 Pa

Length : 8157 m

Manufacturing Date : 2013